Search

Base Hospital Redevelopment

JSL were employed by Fletcher Construction to carry out the set out, monitoring and as-built of the new hospital wing.

This building is a 5-storey wing that  fits into the existing hospital structure, so it is imperitive that the architect's design was checked on site first - to ensure the details of the construction set-out provided fitted with the site constraints.

Once the building footprint was setout, a significant amount of earthworks occured down to the foundation level below the basement.  JSL were monitoring the effects of this on the existing buildings.

Slowly the building is taking shape, with JSL being responsible for the position of every footing, pile,column, pre-cast panel, and floor level.  

See the contruction website here